The Neenah Joint School District began a facilities study with Bray Architects in December 2016. The study was completed throughout 2017. A parent and staff survey was conducted in February 2017 and a comprehensive examination of each building followed.
Beginning in February 2018, the Board of Education held 11 public meetings to address the future of the District's facilities and review the results of the facilities study. A community survey was conducted in October 2018.
On the right side of this page, find detailed results of Bray Architect's facilities study with reports from each building. Recaps of each of the 11 public meetings are published here along with the proposals and information presented at each of the meetings.
|